{"id":17926,"date":"2016-09-28T10:27:30","date_gmt":"2016-09-28T10:27:30","guid":{"rendered":"http:\/\/www.aeroportlleida.cat.mialias.net\/?p=17926"},"modified":"2019-06-25T10:29:22","modified_gmt":"2019-06-25T10:29:22","slug":"aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua","status":"publish","type":"post","link":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/","title":{"rendered":"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua"},"content":{"rendered":"<p>The Department of Planning and Sustainability, through Aeroports de Catalunya, has completed the construction of a dam around the airport in Lleida \u2013 Alguaire that will regulate the flow of the stream named \u00c1guila in situations of heavy rain.<\/p>\n<p>The structure, located close to the airport facilities, is formed by a set of gabions, which are boxes of galvanized steel wire filled with stones that make a resistant wall. The dam is 5 meters high and 28 meters long. The works began in August and will channel the flood water during periods of intense rainfall.<\/p>\n<p>This solution, agreed with Uni\u00f3 de Pagesos (the farmers of the surrounding area), will facilitate the stream gradually transferring the accumulated water from the pond in two days at the most. Thus, the pond will not be permanent, to avoid attracting the emergence of aquatic birds in the area, which could hinder operations at the airport in Lleida \u2013 Alguaire. The works have a cost of 50,700 euros.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-17929 size-full\" src=\"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg\" alt=\"\" width=\"300\" height=\"236\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Department of Planning and Sustainability, through Aeroports de Catalunya, has completed the construction of a dam around the airport in Lleida \u2013 Alguaire that will regulate the flow of&#8230;<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[91],"tags":[],"class_list":["post-17926","post","type-post","status-publish","format-standard","hentry","category-noticies-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua - Aeroport de Lleida-Alguaire<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua - Aeroport de Lleida-Alguaire\" \/>\n<meta property=\"og:description\" content=\"The Department of Planning and Sustainability, through Aeroports de Catalunya, has completed the construction of a dam around the airport in Lleida \u2013 Alguaire that will regulate the flow of...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/\" \/>\n<meta property=\"og:site_name\" content=\"Aeroport de Lleida-Alguaire\" \/>\n<meta property=\"article:published_time\" content=\"2016-09-28T10:27:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-06-25T10:29:22+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg\" \/>\n<meta name=\"author\" content=\"Tecnic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Tecnic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/\"},\"author\":{\"name\":\"Tecnic\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#\\\/schema\\\/person\\\/8270911d351c62c23d8d6febb6cb2ae4\"},\"headline\":\"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua\",\"datePublished\":\"2016-09-28T10:27:30+00:00\",\"dateModified\":\"2019-06-25T10:29:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/\"},\"wordCount\":173,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.aeroportlleida.cat.mialias.net\\\/wp-content\\\/uploads\\\/2016\\\/09\\\/presagabions-300x236.jpg\",\"articleSection\":[\"noticies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/\",\"url\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/\",\"name\":\"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua - Aeroport de Lleida-Alguaire\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.aeroportlleida.cat.mialias.net\\\/wp-content\\\/uploads\\\/2016\\\/09\\\/presagabions-300x236.jpg\",\"datePublished\":\"2016-09-28T10:27:30+00:00\",\"dateModified\":\"2019-06-25T10:29:22+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#primaryimage\",\"url\":\"http:\\\/\\\/www.aeroportlleida.cat.mialias.net\\\/wp-content\\\/uploads\\\/2016\\\/09\\\/presagabions-300x236.jpg\",\"contentUrl\":\"http:\\\/\\\/www.aeroportlleida.cat.mialias.net\\\/wp-content\\\/uploads\\\/2016\\\/09\\\/presagabions-300x236.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inici\",\"item\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#website\",\"url\":\"https:\\\/\\\/aeroportlleida.cat\\\/\",\"name\":\"Aeroport de Lleida-Alguaire\",\"description\":\"Aeropuerto de Lleida-Alguaire\",\"publisher\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/aeroportlleida.cat\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#organization\",\"name\":\"Aeroport de Lleida\",\"url\":\"https:\\\/\\\/aeroportlleida.cat\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/aeroportlleida.cat\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/front-aero-lleida.jpg\",\"contentUrl\":\"http:\\\/\\\/aeroportlleida.cat\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/front-aero-lleida.jpg\",\"width\":2000,\"height\":950,\"caption\":\"Aeroport de Lleida\"},\"image\":{\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/aeroportlleida.cat\\\/#\\\/schema\\\/person\\\/8270911d351c62c23d8d6febb6cb2ae4\",\"name\":\"Tecnic\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f04ae207245779a101cd8940a7ec3eb3caaade6242760e26c768820b9ff3626b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f04ae207245779a101cd8940a7ec3eb3caaade6242760e26c768820b9ff3626b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f04ae207245779a101cd8940a7ec3eb3caaade6242760e26c768820b9ff3626b?s=96&d=mm&r=g\",\"caption\":\"Tecnic\"},\"url\":\"https:\\\/\\\/aeroportlleida.cat\\\/en\\\/author\\\/tecnic\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua - Aeroport de Lleida-Alguaire","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/","og_locale":"en_US","og_type":"article","og_title":"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua - Aeroport de Lleida-Alguaire","og_description":"The Department of Planning and Sustainability, through Aeroports de Catalunya, has completed the construction of a dam around the airport in Lleida \u2013 Alguaire that will regulate the flow of...","og_url":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/","og_site_name":"Aeroport de Lleida-Alguaire","article_published_time":"2016-09-28T10:27:30+00:00","article_modified_time":"2019-06-25T10:29:22+00:00","og_image":[{"url":"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg","type":"","width":"","height":""}],"author":"Tecnic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Tecnic","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#article","isPartOf":{"@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/"},"author":{"name":"Tecnic","@id":"https:\/\/aeroportlleida.cat\/#\/schema\/person\/8270911d351c62c23d8d6febb6cb2ae4"},"headline":"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua","datePublished":"2016-09-28T10:27:30+00:00","dateModified":"2019-06-25T10:29:22+00:00","mainEntityOfPage":{"@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/"},"wordCount":173,"commentCount":0,"publisher":{"@id":"https:\/\/aeroportlleida.cat\/#organization"},"image":{"@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#primaryimage"},"thumbnailUrl":"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg","articleSection":["noticies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/","url":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/","name":"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua - Aeroport de Lleida-Alguaire","isPartOf":{"@id":"https:\/\/aeroportlleida.cat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#primaryimage"},"image":{"@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#primaryimage"},"thumbnailUrl":"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg","datePublished":"2016-09-28T10:27:30+00:00","dateModified":"2019-06-25T10:29:22+00:00","breadcrumb":{"@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#primaryimage","url":"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg","contentUrl":"http:\/\/www.aeroportlleida.cat.mialias.net\/wp-content\/uploads\/2016\/09\/presagabions-300x236.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/aeroportlleida.cat\/en\/aeroports-de-catalunya-completes-the-construction-of-the-dam-to-restore-the-stream-named-aligua\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inici","item":"https:\/\/aeroportlleida.cat\/en\/"},{"@type":"ListItem","position":2,"name":"Aeroports de Catalunya completes the construction of the dam to restore the stream named \u00c0ligua"}]},{"@type":"WebSite","@id":"https:\/\/aeroportlleida.cat\/#website","url":"https:\/\/aeroportlleida.cat\/","name":"Aeroport de Lleida-Alguaire","description":"Aeropuerto de Lleida-Alguaire","publisher":{"@id":"https:\/\/aeroportlleida.cat\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aeroportlleida.cat\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aeroportlleida.cat\/#organization","name":"Aeroport de Lleida","url":"https:\/\/aeroportlleida.cat\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aeroportlleida.cat\/#\/schema\/logo\/image\/","url":"http:\/\/aeroportlleida.cat\/wp-content\/uploads\/2019\/04\/front-aero-lleida.jpg","contentUrl":"http:\/\/aeroportlleida.cat\/wp-content\/uploads\/2019\/04\/front-aero-lleida.jpg","width":2000,"height":950,"caption":"Aeroport de Lleida"},"image":{"@id":"https:\/\/aeroportlleida.cat\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/aeroportlleida.cat\/#\/schema\/person\/8270911d351c62c23d8d6febb6cb2ae4","name":"Tecnic","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/f04ae207245779a101cd8940a7ec3eb3caaade6242760e26c768820b9ff3626b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f04ae207245779a101cd8940a7ec3eb3caaade6242760e26c768820b9ff3626b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f04ae207245779a101cd8940a7ec3eb3caaade6242760e26c768820b9ff3626b?s=96&d=mm&r=g","caption":"Tecnic"},"url":"https:\/\/aeroportlleida.cat\/en\/author\/tecnic\/"}]}},"_links":{"self":[{"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/posts\/17926","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/comments?post=17926"}],"version-history":[{"count":2,"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/posts\/17926\/revisions"}],"predecessor-version":[{"id":17932,"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/posts\/17926\/revisions\/17932"}],"wp:attachment":[{"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/media?parent=17926"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/categories?post=17926"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aeroportlleida.cat\/en\/wp-json\/wp\/v2\/tags?post=17926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}